Blog
Home

Blog

Build your luxury dream house in light steel

Build your luxury dream house in light steel

  • Nov 15, 2022


With the rapid development of urbanization, the pollution and damage to the natural environment caused by the traditional concrete construction method have become more prominent, and with the danger of flooding and other flood disasters, the people of China have also put forward higher requirements for the quality of engineering construction, requiring green, environmental protection, safety, energy saving, etc. into the construction of housing renovation. The unique advantages of light steel villas make them a great success in the modern green building industry.


Environmental protection: 70% of steel and most materials can be recycled, which meets the requirements of ecological building.

Good energy-saving performance: (heat insulation, thermal insulation, sound insulation) advanced technology makes the energy consumption only equal to 40% of the traditional residential system, light self-weight, low cost the foundation, the wall thickness of 14-20cm, building use area increased by 10% compared with concrete structure building, greatly reducing energy consumption costs.

Anti-corrosion, insect-proof: galvanized steel, no native wood, both anti-corrosion and free from insect and ant erosion.


Fire resistance, and durability: all materials are non-combustible while considering the fireproof structure to meet the national fire prevention code.


Seismic and wind resistance: The self-weight is light, and the seismic performance achieves 9 degrees of defense and can withstand typhoons of grade 12. The design fully considers wind and snow load and can withstand wind and snowstorms.


Good sound insulation effect: wall sound insulation: ≥45dB (four-star hotel standard)


Floor sound pressure level: ≤65dB (five-star hotel standard)



Superior air humidity regulation performance: use new materials, so the wall has a breathing function.

Light steel villa construction efficiency, a 150 square foot house, the traditional brick construction period must be at least 5 six months, but a light steel structure in 40 days to complete, from time, labor costs can save a lot of money.


View more: releated product.

© Copyright 2024 Buildmart (Xiamen) Building Material Technology Co., Ltd.. All Rights Reserved.

IPv6 network supported

IPv6 network supported

top

Leave A Message

Leave A Message

    If you have questions or suggestions,please leave us a message,we will reply you as soon as we can!

  • #
  • #
  • #