In the morning of Jan 22nd, our intra-company engineers went together for Software Communication.
Are you looking for an multi-function interior wall siding / wall cladding material? Buildmart Snow Board has high fire-prevention performance, high resilience, and earth quack resistance. Our Snow Board can withstand 950℃ fire in 60 minutes and have high flexibility, and high strength.
Elon Musk sold the mansion and moved into a 37-square-meter prefab house? False news! Just like the last time I slandered and hyped Dogecoin, I don’t know why so many people admire this person. My subconscious mind tells me that this person may be evil... Like this event in the boardroom, it is also a train full of mouths, a product of BOXABL. I saw it, it’s really general. Compared with the company I’m going to introduce today, there is a big gap in product design. Perhaps the news headline fits the description of their product "board house"~ But anyway, tiny house, etc. Being in a gray area outside the supervision of the construction industry, it may be the first area where the construction industry has undergone transformation. I am responsible for this conclusion~ This Futuristic tiny Prefab Home Is Now Available for $50K Whether you’re looking to hit the road or build a backyard ADU, the Microhaus offers mega convenience in a pint-sized package. The team at Haus.Me recently expanded their collection of prefab homes with a brand-new mobile dwelling known as the Microhaus. The 120-square-foot structure features a fully equipped, high-tech living space that can run self-sufficiently, and it’s designed to be installed within minutes. After the overwhelming success of their first prefab model in 2019, Haus. Me has revealed their latest project—the Microhaus. Measuring 120 square feet and available starting at $50,000, the tiny unit arrives fully assembled and ready to use. "The composite structure is extraordinarily durable," says Haus.Me CEO Max Gerbut. "Its yacht-inspired exterior is created from fiberglass, stainless steel, and teak." "After years of researching and prototyping, we’re thrilled to finally launch Microhaus, the most advanced micro home in the world," says Max Gerbut, CEO of Haus.Me. Created using 3D-printed structural components, the prefab dwelling arrives move-in ready with a kitchenette, double bed, bathroom (including a full-size shower and toilet), and plenty of storage. "The Microhaus also comes with our fully integrated Cloud Self-Diagnosis System, which provides a new generation of Smart Home amenities, full remote control, and machine learning," explains Gerbut. The tiny dwelling’s interior presents a sun-kissed atmosphere thanks to its extensive glazing. White custom cabinetry contrasts with the natural wood elements found throughout the space. To complement its high-tech capabilities, the tiny, portable structure presents a sleek, modern aesthetic—both inside and out. The exterior is composed of rounded fiberglass and stainless steel, while the interior is layered with warm wooden elements and illuminated by natural light. "The unit comes with an array of high-tech features, including a motorized door, touchless access, touchless faucets, adaptive lights, and air-quality sensors" Gerbut says. The sleeping area has an abundance of storage space, including a floor-to-ceiling cabinetry unit. "These homes are energy effic...
Generally speaking, the rainwater on the roof flows into the gutters and gutters to gather, and then drains out the building through water downholes. Due to the deformation of the gutter layout and temperature difference. It cannot be synchronized with the deformation of the roof layout layer, so cracks simply occur. Some waterproof structure descriptions are unreasonable or construction is not handled properly. For example, the drainage slope in the gutter is small, and the small drop hole is not wiped into a cup according to the rules. Some water drop cups are rear devices, but they are higher than the bottom of the ditch, and the surrounding water will not go out, forming water in the ditch; the pores where the water drop cups touch the bottom layer are not filled with fine stone concrete It is compact and has no grooves embedded with sealing materials. Rainwater leaks along the outer wall of the water drop; some water drop holes are small and often have the appearance of blockage. The rainwater in the finished gutter cannot be discharged and overflows into the room. The above are the main reasons for the leakage of gutters and gutters. In order to avoid leakage, the waterproof layer of gutters and gutters must be constructed strictly according to the specific methods. 1. Construction operating conditions The water drop cup must be installed first; the elevation of the cup mouth surface should be 30mm lower than the leveling layer at the bottom of the gutter. The gap between the drip cup and the bottom touch point is densely filled with cement: sand: fine stone concrete with a ratio of 1:2:2. A 20mm x 20m groove is reserved around the water drop cup, which should be filled with waterproof sealing material, and it is qualified if the water does not leak. The slope of the bottom of the ditch must reach the 1% rule; the corners in the bottom of the gutter and eaves must be painted in an arc with a radius of 100mm. See picture 2. The waterproof layer construction of gutters and gutters must first be an additional reinforcement layer. If asphalt-based waterproofing membrane is used, one additional house should be laid; if polymer-modified asphalt waterproofing membrane is selected or composed of polymer waterproofing membrane, it is advisable to use a waterproof coating reinforcement layer with the same material properties. Coiled materials in gutters and gutters should be laid from the bottom of the gutter, and a strip of coiled material with a width of 200rnm should be laid empty at the junction of the gutter and the roof. The coiled material of the eaves gutter should be closed, and the outer edge should be trimmed and pressed into the recessed corner of the revolving place to fix it, and be nailed with bead and cement. Seal with sealing material; the inner side and roof waterproof layer shall be constructed simultaneously! 3.Precautions: In order to avoid the overflow of the water falling in the ditch, the inner eaves should be filled with wate...
Steel structure building is a new type of building system, which has the advantages of light weight, easy installation, short construction period, good seismic performance, fast investment recovery, and low environmental pollution. Therefore, it is generally favored by all parties in the industry. Under the influence of national policies such as green building, energy conservation and environmental protection, and resource recycling, steel structures have gradually been widely used in the construction of prefabricated buildings, and the scale of the steel structure industry has been expanding. At the 2021 Eighth China Passive Assembly Building Summit Forum (hereinafter referred to as the forum) held a few days ago, Cui Yuansheng, chief expert of the Building Materials Industry Technology Information Institute, said that although compared with foreign developed countries, the level of application of steel structures in my country is relatively low. , But learning from the development experience of foreign prefabricated buildings, coupled with the influence of domestic policies, it can be foreseen that the steel structure industry will develop rapidly, and steel structure buildings may become the mainstream choice for constructing prefabricated buildings. According to the prefabricated building structure system, the prefabricated building can be divided into precast concrete structure, steel structure and wood structure. Among them, the steel structure is composed of beam steel, steel column, steel truss and other components supported by section steel and steel plate. Each component or component is usually connected by welds, bolts or rivets. At the same time, silanization and pure manganese phosphating are used. , Washing, drying, galvanizing and other rust-removing and anti-rust processes. It was learned from the forum that compared to traditional concrete buildings, steel structure buildings have replaced reinforced concrete with steel plates or section steels, which have higher strength and better seismic resistance. And because the components can be manufactured in factories and installed on the construction site, the construction period can be greatly shortened. Due to the reuse of steel, construction waste can be reduced, and it is more environmentally friendly, so it is widely used in industrial and civil buildings. According to relevant data, at present, the domestic steel structure industry is showing a rapid development trend. The output of steel structure increased from 8.5 million tons in 2002 to 22.94 million tons in 2009, with an average annual compound growth rate of 15.24%. From 2010 to 2019, it was the stage of rapid development of steel structure, and the output of steel structure increased from 26 million tons to 73.73 million tons. Because steel structure has the advantages of high strength, light weight, good overall rigidity, and strong deformability, it is especially suitable for the construction of large-span, super-high an...
The rapid development of prefabricated concrete structures. With the continuous improvement of the industrialization of residential buildings, the application of prefabricated external wall panels, prefabricated beams, and prefabricated stairs in construction projects has become more and more extensive. The main points of prefabricated assembly construction are sorted out one by one for reference. A. Installation and construction of prefab laminated balcony slabs 1. The prefabricated balcony is hoisted with 4 rings reserved on the prefabricated board. 2. In the process of hoisting the balcony board, the balcony board should stop 500mm away from the working surface, adjust the position, and then install it, the action should be slow during installation. 3. After aligning the control line and placing the balcony board, fine-tune the position to ensure the horizontal placement, and finally adjust the elevation with the U-shaped bracket; 4. After the balcony is hoisted and installed, it must be rectified to ensure the installation quality B.Installation and construction of prefabricated laminated panels 1. When hoisting the laminated board, use the modular lifting beam when lifting, and the lifting process is slow to ensure the stability of the laminated board; 2. During the hoisting process, stop at a distance of 300mm from the working floor to adjust and position the direction of the laminated board; avoid collision during the hoisting process, stop and slow down to ensure that the laminated board is intact. 3. Temporary brackets are to be made at the bottom during installation, and the spacing between the supporting points is 150cm. Each bay support frame is set in 2-3 rows; 4. If the construction of the structural layer is to be carried out, a double-layer bracket shall be installed. After the construction of a laminated floor is completed, the cast-in-place concrete strength is greater than or equal to 70% of the design strength before the next bracket can be removed。 C. Installation and construction of precast wall panels 1. In order to ensure that the wire ropes on both sides of the different components are hoisted to replace the lifting points and consume a lot of time, set the lifting beam as two lifting points on one side, and set the component numbered lifting points on the other side according to the needs of the engineering components. 2. Modular hoisting beams are used for wall panel hoisting. Reasonable hoisting points are used according to the hoisting ring position of the prefabricated wall panel. The wire rope is connected with the reserved hoisting ring of the external wall panel with a shackle. The hoisting can be continued after the hoisting ring is connected correctly. 3. Before lifting, it is necessary to nail a 500mm wide multi-layer board on the lower side of the prefabricated wall panel. Knock it off requires a slow and uniform speed to ensure that the edge of the prefabricated wall panel is not damaged. 4. When prefabr...
2
2
pagesCategories
New Products
Easy Installation Waterproof Spc Vinyl Flooring Click Lock System Skirting Read More
3 Stories House Design Heavy and Light Steel Framing Villa Hurricane Resistance Wind Resistant 150mph in Florida USA Read More
China Modern Stable Prefabricated Light Gauge Steel Framing House Easy Installed Read More
Modern Luxury Design 2 Story Prefab Light Steel Villa House Read More
lightweight steel framing House Light Steel Prefab House Read More
Light Steel Frame Structure Design Suit for Residential Home Luxury Villa Hotel Read More
Fully Assembled Modular Light Gauge Steel Framing Villa Read More
Light Steel Frame Prefabricated Steel Building Prefab House Read More
© Copyright 2024 Buildmart (Xiamen) Building Material Technology Co., Ltd.. All Rights Reserved.
IPv6 network supported